Roof damage insurance claim after a storm

General information, not legal or insurance advice. Your policy and state rules control.

Roofs are the most-claimed, most-disputed and most fraud-adjacent part of storm recovery: big money, damage the owner can't see, and a wave of out-of-town crews knocking on doors. Here's how to run the claim so the roof — and the payout — end up whole.

Document without climbing

Choosing the roofer (the fraud filter)

The money mechanics

Run the whole roof claim from one dated file.

ClaimsVault: damage photos, call log, receipts, deadlines — exported as a claim file PDF. $9.99 once.

Get ClaimsVault

FAQ

Should I sign an AOB (assignment of benefits) with a roofer?

Be careful. An AOB hands your claim rights to the contractor. Some are legitimate; post-storm, many are not, and several states have tightened AOB rules for exactly that reason. You can almost always get the roof fixed without assigning your claim — read anything you sign after a storm twice.

The insurer wants to repair, the roofer says replace. Who wins?

Documentation wins. Matching issues (discontinued shingles), the extent of damage across slopes, and local code upgrade requirements are the usual arguments for full replacement. Get them in writing from your roofer and submit them — decisions change on paper, not on phone calls.

My first check seems way too small for a new roof.

It's probably the ACV payment: replacement cost minus depreciation, with the rest released after the work is done and receipted. See our RCV vs ACV guide — roofs, being big-ticket and heavily depreciated, are where recoverable depreciation matters most.

How long do I have to file after a storm?

Policies and states set claim deadlines — often a year or more for hurricane damage, but sometimes much less, and storm-chaser season moves fast. Inspect and file early: roof damage worsens with every rain, and late claims invite 'wear and tear' denials.